Installation

Installation is quoted per sq ft as its own line, so you always see what material and labour cost.

Illustrative render

Our installation standard

  • Acclimatise boxes flat in the room for 48 hours (wood: as specified).
  • Subfloor: dry, clean and flat within 3 mm over 2 m; loose or hollow tiles fixed first.
  • Moisture barrier where the slab is on the ground or recently cast.
  • Expansion gaps of 8–10 mm at walls and fixed objects, hidden by skirting; profiles at doorways and long runs.
  • Wet areas: SPC/LVT click floors are not a substitute for waterproofing; bathrooms need glue-down vinyl with a sealed perimeter.

Over existing tiles

Rigid-core SPC and laminate can usually be laid over sound vitrified tiles with narrow grout lines — no demolition, little dust. We confirm it at the measurement visit.

Who installs

We are onboarding trained installation partners city by city. Where none is available yet we brief your contractor with our installation guide.

Ask for an installation quote

We use your details only to reply to this request. No spam, no sharing.